📄️ 1. Accessing commissioning interface
Make sure the is switched on and connected to the network.
📄️ 2. Grid limits
The grid system, current and power limits are requested during the initial setup. You can later change them from the menu "Settings" in the commissioning interface.
📄️ 3. Location / address
The uses its location to retrieve local weather forecasts. This is necessary for accurate control of connected devices.
📄️ 4. PV panel configuration
The PV panel configuration is requested during the initial setup. You can change it later under the "Settings" menu in the commissioning interface, in the "PV installation details" submenu.
📄️ 5. Add grid energy meter
You should add the grid energy meter as the first device. This makes the rest of the configuration a bit easier.
📄️ 6. Add other devices
For the specific wiring and configuration of your device, see "Supported devices"
📄️ 7. Grouping devices
Go to the "Groups" tab in the commissioning interface.
🗃️ 8. Local control modes
7 items
📄️ 9. External control signals
For the full list of support external control signals, see "Supported External Control Integrations"
📄️ 10. Link to your account
1. Log in to the app (smartphone) or (computer).
🗃️ 11. Extra Information
14 items